- Our references in 2023 -

get an idea of our work

Hot Topics 2024

HANA Workload Management

Effective and Efficient Use of Resources

Requirement: Optimal use of resources

HANA Downsizing

Downsizing Impact Analyse

Requirement: Downsizing of hardware

GoLive Support für Cloud-Migration

________________

industry

energy supplier

________________

seat

Germany

________________

number of employees

>10,000 employees

________________

Period

from 2023/11

________________

SAP products used

IS-U, CRM


  • identifying bottlenecks
  • mapping of the workload
  • increase in performance
  • reducing main memory consumption
  • Partitioning in the migration process (Interval Option)
  • Health Check
  • parameterization
  • Hyper Care support
  • Introduction NSE
  • Introduction of Workload Classes
  • HSR optimization
  • ANF optimization


________________

platform

MS Azure

________________

Vicinity

SLES15 SP5 / HANA 2.0 SPS07

________________

number of systems

12 SIDs

________________

resources

37 TB RAM

>1400 vCPUs

________________

Result

Stable and high-performance operation

________________

project manager

Jens Gleichmann



Support SAP HANA operation

________________

industry

Insurance

________________

seat

Germany

________________

number of employees

>10,000 employees

________________

Period

since 2021

________________

SAP products used

S/4HANA 2021



  • planning update
  • Configuration HANA
  • implementation update
  • Monitoring / performance tuning (HANA Cockpit)
  • security settings
  • certificate management
  • architecture


________________

platform

RHEL 8.x / HANA 2.0 / SPS07

VMware

________________

number of systems

>10 SIDs

________________

resources

>4 TB RAM

>200 vCPUs on VMware


  SAP HANA NSE

industry

Retail

________________

seat

Germany

________________

number of employees

>170,000 employees

________________

Period

from 2021/04

________________

SAP products used

S/4 Retail, MDG, TM, CAR, F&R

  • Analysis NSE Candidates
  • optimization of resource utilization
  • KPI definition
  • NSE deployment at table level
  • partitioning
  • Monitoring for NSE
  • performance tuning



________________

platform

MS Azure

________________

Vicinity

Source: SLES15 SP4 / HANA 2.0 SPS5/7

________________

number of systems

18 SIDs

________________

resources

180 TB RAM

>12000 vCPUs

________________

Result

Saving over 21TB of main memory

________________

project manager

Jens Gleichmann

  SAP HANA NSE on BW/4HANA

________________

industry

Retail

________________

seat

Germany

________________

number of employees

>170,000 employees

________________

Period

from 2023/10

________________

SAP products used

BW/4HANA 2022, IQ


  • Analysis NSE Candidates
  • optimization of resource utilization
  • KPI definition
  • NSE deployment at table level
  • Identification BW Troubleshooting Tips


________________

platform

Bare Metal / VMware

________________

Vicinity

Source: SLES15 SP5 / HANA 2.0 SPS07

________________

number of systems

4 SIDs

________________

resources

28 TB RAM

>1800 vCPUs

________________

Result

Saving over 4TB of main memory

________________

project manager

Jens Gleichmann

S/4HANA 2022 Conversion

________________

industry

steel industry

________________

seat

Germany

________________

number of employees

>25,000 employees

________________

Period

2023/09 - ongoing

________________

SAP products used

S/4HANA 2022


  • Health Check
  • Troubleshooting SUM
  • partitioning
  • Optimization Performance of Conversion
  • parameterization
  • SQL performance tuning


platform

VMware

________________

Vicinity

Source: RHEL8.4 / DB6

Target: RHEL8.6 / HANA 2.0 SPS07

________________

number of systems

>5 SIDs

________________

resources

>11 TB RAM

>240 vCPUs

________________

project managers

Jens Gleichmann

Matthias Sander

  HANA Performance Tuning

________________

industry

construction and industry

________________

seat

Denmark

________________

number of employees

>1,000 employees

________________

Period

from 2021/12

________________

SAP products used

ERP

 

  • Architektur
  • Sizing
  • Health Check
  • HANA SQL Performance Tuning

 

________________

platform

IBM Power

________________

Vicinity

Source: SLES15 SP4 / HANA 2.0 SPS05

________________


number of systems

3 SIDs

________________

resources

>6 TB RAM

________________

project manager

Matthias Sander

 HANA Health Checks

________________

industry

sanitary area

________________

seat

Switzerland

________________

number of employees

>12,000 employees

________________

Period

from 2021/10

________________

SAP products used

ERP, BW, CRM

  • architecture
  • sizing
  • VMware optimizations
  • HA/DR concept
  • scalability
  • HANA Partitioning
  • Workshops for knowledge transfer of new HANA features
  • HANA Performance Tuning
  • Capture & Replay

platform

VMware

________________

Vicinity

Source: SLES15 SP5 / HANA 2.0 SPS05

________________


number of systems

9 SIDs

________________

resources

>14 TB RAM

________________

project manager

Matthias Sander


  SAP HANA NSE / Performance Tuning

________________

industry

machine manufacturers

________________

seat

Germany

________________

number of employees

>30,000 employees

________________

Period

from 2022/01

________________

SAP products used

ERP


  • architecture
  • sizing
  • determination of savings potential
  • scalability
  • HANA Partitioning
  • Workshops for knowledge transfer of new HANA features
  • HANA SQL Performance Tuning


________________

platform

IBM Power

________________

Vicinity

Source: SLES15 SP2 / HANA 2.0 SPS05

________________


number of systems

3 SIDs

________________

resources

>6 TB RAM

________________

project manager

Matthias Sander


  SAP HANA Health Check

Workload Management

________________

industry

metallurgical and rolling mill technology

________________

seat

Germany

________________

number of employees

>15,000 employees

________________

Period

from 2024/01

________________

SAP products used

ERP, S/4HANA


  • optimization of resource utilization
  • partitioning
  • KPI definition
  • SQL optimization
  • HANA Monitoring
  • Limitation via Workload Classes
  • HANA Workshop
  • NSE Forecast
  • HSR: multi-tier replication



platform

VMware

________________

Vicinity

Source: RHEL8.4 / HANA 2.0 SPS05

________________

number of systems

>3 SIDs

________________

resources

>10TB RAM

>250 vCPUs

________________

Result

stabilization

________________

project managers

Jens Gleichmann

Matthias Sander

  SAP HANA Health Check

Workload Management

________________

industry

heating technology

________________

seat

Germany

________________

number of employees

>15,000 employees

________________

Period

from 2023/12

________________

SAP products used

ERP, S/4HANA


  • optimization of resource utilization
  • Housekeeping / Archiving
  • partitioning
  • KPI definition
  • SQL optimization
  • HANA Monitoring



platform

IBM Power

________________

Vicinity

Source: SLES15 SP4 / HANA 2.0 SPS07

________________

number of systems

>20 SIDs

________________

resources

>32TB RAM

>1000 vCPUs

________________

Result

stabilization

________________

project managers

Jens Gleichmann

Matthias Sander

Support SAP Operations

________________

industry

hoster

________________

seat

Germany

________________

number of employees

>120 employees

________________

Period

from 2019/09

________________

SAP products used

ERP, EWM, SCM, CAR, F&R, S/4


  • Maintenance SAP / OS
  • SAP upgrades
  • HANA upgrades
  • SAP installations
  • Performance Tuning
  • troubleshooting
  • integration of new architectures
  • Activation of new HANA features
  • continuous sizing / growth analyses
  • health checks


________________

platform

x86 VMware IBM Power

________________

operating system

SLES15

________________

number of systems

>200 SIDs

________________

resources

>400 TB RAM

________________

project managers

Michael Hermsen

Matthias Sander


Support SAP Operations

________________

industry

bank

________________

seat

Germany

________________

number of employees

>6,000 employees

________________

Period

from 2023/11

________________

SAP products used

S/4 HANA

Complex Loans

TRBK (Transactional Banking)

Payment Central


  • Maintenance SAP / OS
  • SAP upgrades
  • HANA upgrades
  • SAP installations
  • Performance Tuning
  • troubleshooting
  • implementation of third-party solutions


________________

platform

x86 VMware

________________

operating system

SLES15 SP3

________________

number of systems

7 SIDs

________________

resources

> 1TB

> 100vCPUs

________________

project manager

Michael Hermsen

Support SAP Operations

________________

industry

furniture manufacturer

________________

seat

Germany

________________

number of employees

>4,000 employees

________________

Period

from 2022/06

________________

SAP products used

ERP, EWM, SCM


  • Maintenance SAP / OS
  • SAP upgrades
  • HANA upgrades
  • SAP installations
  • Performance Tuning
  • troubleshooting
  • integration of new architectures
  • Activation of new HANA features
  • continuous sizing / growth analyses
  • health checks


________________

platform

x86 VMware

________________

operating system

RHEL7 / 8

________________

number of systems

>30 SIDs

>40 HDBs

>60 AS

________________

resources

>25 TB RAM

>400 vCPUs on VMware

________________

project managers

Michael Hermsen

Jens Gleichmann

Share by: